Please immediately check for any hidden damage that may have occurred in shipping. If any damage is found you must notify the delivering carrier within seven days. A few minutes with the following instructions will insure quick and proper assembly, and many years of enjoyment and relaxation. By reviewing all the instruction steps ahead of time, you will have a better feel for the whole process. Your sauna package will arrive on a stretch-wrapped pallet including a stack of pre-built panels, benches, and boxes with the heater and accessories.
Your sauna can be placed on concrete, tile, linoleum, or any surface that does not absorb water. Do not install the sauna on carpeting.
To o l s R e q u i r e d
710-0107 Panel Built Installation Rev. 01
•Hammer or pin nailer •Handsaw and mitre box (for molding installation & vent holes) •Drill or cordless screwdriver •Tape measure •Square •Level •3/8” wood bit (if sauna room has an L-bench) •3/4” wood bit (optional, see photo B2) •Note: Torx bit is provided
9/8/04 R.D. MW
Accessories
Duckboard Vent Valve
Note: Half of the groove has been removed for easy installation
Trim Profiles
Bench Electrical Access Board
Cove Molding
Window/Door Casing (normally pre-installed)
Door Handle
Inside Corner Molding
Vent Grill
Exterior Facia Trim (in some models)
The Term Paper on Floating Point Coprocessors Coprocessor Instruction Mcp
Floating Point Coprocessors The designer of any microprocessor would like to extend its instruction set almost infinitely but is limited by the quantity of silicon available (not to mention the problems of testability and complexity). Consequently, a real microprocessor represents a compromise between what is desirable and what is acceptable to the majority of the chip's users. For example, the ...
Headrest
Backrest
Hardware Package
Outer 45 Deg. Corner Molding (on rooms w/more than 4 walls)
Inside 45 Deg. Corner Molding (on rooms w/more than 4 walls) Finishing Nails 2” Screws 1-1/2” Screws Carriage Bolts
(for saunas with L-benches)
3” Screws Torx Bit Wood Joiners
Washers & Nuts
710-0107 Panel Built Installation Rev. 01
1
9/8/04 R.D. MW
Facia Trim Ceiling Panel
Top Plate Interior Cove Molding Benches Exterior Corner Trim Wall Panel
Standard Panel-Built Sauna
Exploded Assembly
base frame Duckboard Floor
1
2
Base Frame Assembly If the sauna is to be positioned close to a wall or corner, start assembly away from the wall and once the rear panels are istalled push the sauna into place. 1 Position the base frame on the floor (photo A).
The largest number on the base frame is the standard door location. The stamped numbers on the base frame should be readable from inside of the room and correspond to the wall panels that will be placed on them in a later step. 2 The air inlet should be as near the heater as possible. Using a hand saw or a sabre saw, cut a notch approximately 6 inches long in the bottom half of the base frame (photo B1).
Another option is to drill four 3/4” holes in the base frame below the heater (photo B2).
3 Using one three-inch screw at each corner and the pre-drilled holes, fasten the corners of the base frame (photo C).
Note: The pre-drilled holes are purposely made at an angle. 4 Using a level and a square, make sure the base frame is square and level. Shim it where needed with standard shims.
10
A
B1
B2
C
710-0107 Panel Built Installation Rev. 01
2
9/8/04 R.D. MW
Wall Panel Installation If the sauna is to be placed against existing wall(s), panel installation should begin at these sides. After these panels are in place, the sauna can be slid back towards the wall(s) keeping it 1/2” to 1” away. All wall panels are numbered at the top and should be readable from the interior of the room. These numbers will coincide with the numbers on the base frame. NOTE: The tongue and groove on the panels will always face the same direction. 5 Start your wall panel assembly in a corner. NOTE: It is not always necessary to install your panels in sequence according to their numbers. Two wall panels make up each corner. Slide one panel along the base frame until its 2×2 framework is flush with the outside of the base frame (diagram A, panel 3).
The Term Paper on Four Styles Of Roman Wall Painting And Mosaics
A. Mau, a German scholar, established four distinct styles of Roman wall painting at the sites of Pompeii, Herculaneum, Bosco real, and other smaller sites covered with ash from the volcanic eruption at Mount Vesuvius. The styles begin with one direction, shift completely, and end on a more combined technique. Style I, known as incrustation, began approximately during the second century b. c. This ...
NOTE: For ease in installing the panels, tilt 2 the top of each panel back to get the tongue and groove alignment started . Then tilt forward for an easy fit. 6 Have someone hold the first panel in place and then put the other corner panel on the base frame and slide it tight into the corner so its 2×2 framework butts up against the framework of the other panel (panel 4 from diagram A).
*There are 2 methods for fastening your wall panels … Exterior (Standard): To be followed when there is easy access to all exterior corners of the sauna. See diagram B and follow steps 7A & 8A. Interior (Alternate): When room was ordered as “Interior Install”. See Diagram C and follow steps 7B & 8B.
3″ Torx Screw
D
3
4
diagram A
5
4
7A Fasten the two panels together from the outside of the room using 3” torx screws. Holes are pre-drilled.
Exterior Corner Trim
3
8A Install exterior, pre-assembled corner trim with provided #4 finishing nails. (photo E).
NOTE: One side of the groove has been or removed for easy installation. 7B Fasten the two panels together from the inside of the room using 3” torx screws. Angled holes are pre-drilled. 8B Install the removed interior tongue & groove using #4 finishing nails. NOTE: If exterior corner is exposed install exterior, pre-assembled corner trim with provided #4 finishing nails. (photo E)
diagram B
4
Exterior Installation
Interior Installation
Exterior Corner Trim
E
3
Replace Interior T&G 3″ Torx Screw
4
diagram C
710-0107 Panel Built Installation Rev. 01
E 3
The Term Paper on Four Styles Of Roman Wall Painting
The wall paintings evolved from around 2nd BC. Romans created these extravaganza works to emphasise their wealth. The evidence for the techniques used is described by Vitruvius’ in _De Architectura._ He noted that wall paintings were interior wall designs as frescoes, which were executed using damp plaster (lime and sand mixed together). There must have been at least several layers of this ...
9/8/04 R.D. MW
9 Continue setting the panels into place as marked. Use the barbed wood fasteners to join the tops of the panels (photo F).
IMPORTANT: If you are in a low ceiling height situation (space above sauna is less than 3”).
You must put the top plate and ceiling panels in before installing the front wall panels as described in step 10 method B. NOTE: The door panel should be installed before your last corner panel is put in place. Use two people to move it as it is quite heavy. Top Plate Installation After installing the wall panels, the next step is to assemble and install the top plate (sometimes referred to as the “ceiling frame”).
This top plate aligns and locks the top of the wall panels together. There are 2 methods for fastening your top plate … Standard: To be followed when there is easy access to the top of the sauna. Alternate: To be followed when access to the top of the sauna is limited. 10a (Standard): In most installations it is easier to install the top plate one piece at a time, rather than pre-assembling it on the floor. To do so, install the sections onto the front and back wall with the notched ends facing up (photo G).
Then put the side pieces of the plate into place. Firmly press it down (use a hammer if needed) till it rests on the framework of the wall panels. The top of the plate should be flush with the top of the interior tongue and groove. Fasten with one 2” screw in each corner (photo H).
10b (Alternate): (Especially needed for low ceiling heights) Layout all pieces of your top plate on the floor. Using one 1” screw in each corner, fasten all corners together then drop the top plate into place along the top of the wall panels. Firmly press it down, using a hammer if needed, till it rests on the framework of the wall panels. The top of the plate should be flush with the top of the interior tongue and groove. 11 Install the provided foam tape along top plate to give a better seal once the ceiling panels are installed. Tape should be centered on the top plate and will encircle the entire room. Ceiling Panel Installation Low Height Installation Tip: If the clearance above the sauna is less than 3”, the ceiling panels should be installed prior to the front wall panels. 12 With one person inside the sauna room and another outside, feed the ceiling panels over the top of the walls being very careful not to scratch the panels (photo I).
The Term Paper on Control Panel System House Alarm
Introduction There have been a number of burglaries in the area in which the Peterson family are living; thus they have become increasingly interested in Control Technology in their home. They have contacted me, and my task is to prepare a report, which advises them upon various alarm systems, also considering fire detection systems. I am going to provide the Petersons with two reports, one ...
When in position, they will rest on the top plate. 13 In the case of more than one ceiling panel, adjoin the panels as shown. Lift the panels together, then lower at the same time allowing the tongue and groove to lock together (photo J).
NOTE: In larger saunas, 3 or more ceiling panels may be provided.
F press top plate down into position
G
H
front panel removed for photo I
front panel removed for photo J
710-0107 Panel Built Installation Rev. 01
4
9/8/04 R.D. MW
Cove Molding Installation 14 The cove molding (3/4” x 1”) will be provided longer than needed to allow trimming to exact size to insure a tight fit. Measure each wall to determine cut length. A simple butt-end cut is the easiest. Cut molding straight, then butt the pieces together (photo K).
If you prefer a mitre joint, the molding is long enough to accommodate that type of cut as well. 15 Using #4 finishing nails (Pneumatic nailer preferred), nail the cove molding to the interior walls. 16 Once the molding is secured to the walls nail it through the bottom & into the ceiling to help keep it in place. Vent Valve and Vent Grill Installation NOTE: One wall panel has a 4” x 6” opening in it for an air outlet vent. This panel is typically located on the back wall or toward the back of a side wall. 17 Slide the valve door open and place the opening directly over the 4” x 6” cutout. Making sure it is level, fasten it with two 1-1/2” screws (photo L).
18 From the outside of the sauna, center the wood grill over the exterior of the 4” x 6” cutout, with the louvers facing down. Making sure it is level, fasten with four 1-1/2” screws (photo M).
NOTE: If your back wall is hidden, the grill is not needed. Bench Installation In standard cases, the benches are positioned with the upper bench against the back wall of the sauna, and the lower bench parallel to it. There are four bench support boards: two that are 22-3/4” long for the upper bench, and two that are 46” long (length can vary with sauna model), for the lower bench. This extended length will allow the lower bench to slide under the top bench for ease in cleaning. Bench configuration will most likely be different with custom designed rooms. NOTE: The interior walls have been marked at the heights you should attach the bench supports, generally top bench support at 30” and lower bench support at 12” off the floor. These are the heights of the top edge of the bench supports, not the top of the benches! 19 Position the bench supports about 1/4” away from the back walls. Making sure they are level, use 3” screws and pre-drilled holes to secure the bench supports to the walls (photo N ).
The Term Paper on Solar Panel Services
Introduction My neighbor Cindy is asking my advice about her new idea of running a contracting business for the installation of solar panels. She is interested about the cost savings that households and business can take advantage of as a competitive advantage to promote the investment. In addition, she thinks that consumers will be willing to invest in solar panel services due to the reality that ...
Be sure to install screws in all the pre-drilled holes. When installed at the height noted, the 3” screws will line up with the internal framing of the panels for necessary strength. 20 Install the benches, starting with the bottom bench first. Note that one side of the bench is finished, while the other has exposed framing. (This may vary with custom designed rooms).
The bench should be installed with the finished face forward. Unless instructed otherwise, the benches do not need to be fastened to the walls. This will allow for ease in cleaning. However, if you desire no moveability of benches, fasten the benches directly to the wall using 3” screws through the 2×4 bench framework (the bench supports should still be used).
9/8/04
K
L
M
pen c mar il line w ked i on t ll be he p ane ls
N
710-0107 Panel Built Installation Rev. 01
5
R.D. MW
NOTE: Two 3/8” holes have been drilled through the frame of the upper L-bench. With the top of the benches aligned, use a 3/8” drill bit and drill through the 2 provided holes and through the face of the main upper bench. Bolt the two benches together using the 5-1/2” carriage bolts provided (photo O).
Custom designed rooms may have a different bench configuration. Backrest Installation Some sauna models include backrests. Actual installation height will vary, depending upon the height of the sauna owner/user. Position it so the backrest is in the mid-back/shoulder blade area… whatever feels most comfortable. A standard height is 20” from top of bench to top of backrest. 21 Making sure it is level, hold the backrest at your preferred height, fasten it to the wall through the predrilled holes, using 2” screws (photo P).
Wood plugs are provided to cover the exposed screw head. 22 Repeat step 25 if more than one backrest is included. Typically one backrest for each upper bench is included. Exterior Facia Installation NOTE: Do not install the facia until your heater is wired since the electrical access board may need to be removed. 23 The facia can be installed using simple butt-end cuts, or with mitre cuts. If using butt-end joints, cut the side wall facia the same length as the side walls (photo Q).
The Essay on The Dark Side Of Kfc
The Dark Side of KFC The fastfood industry has globally conquered the market of fast-paced people who want instant service the moment they need it, wherever they are. Food primed and ready for cooking the moment a customer orders it has become the sustenance of most of the worlds workforce. Fastfood eating has spread from the United States to Europe and Australia up to the Africa including the ...
Using the provided galvanized finishing nails, fasten with the top edge of the facia flush with the top edge of the ceiling panel. The front facia should be cut to overlap the side facia. Install flush with top of ceiling panel. Heater Guard Installation 24 Place the heater guard around the heater as described in your heater instructions. Spacing may vary according to heater kilowatt. NOTE: The front rails of the 2-sided heater guard can be cut to desired length before assembly. Interior Light Installation 25 The light should be wired by a licensed electrician according to local codes. The light can be mounted on a wall of your choice. If you plan to use the corner lampshade, then the light will need to be installed tightly into a corner, 4” down from the cove molding (photo R).
Otherwise, off to one side of the door is most common. Sauna Heater Installation 26 The heater should be wired by a licensed electrician according to the specifications provided with the heater. One of the wall panels has a removable board to allow for wiring access to the heater (photo S).
This tongue and groove board is located in the trim package. After the wiring is completed, attach the board with the galvanized nails provided in the hardware pack.
upper main bench
upper L-bench Bolt
Underside View
O
P
front
side
NOTE: facia on front will overlap facia on side when using butt joint Q
R
S
710-0107 Panel Built Installation Rev. 01
6
9/8/04 R.D. MW
Door Handle Installation A pair of door handles is provided with each door. 27 Using the screws provided, install the door handles with the center of the handle approximately 36” off the floor, or whatever height is most comfortable (photo U).