Process costing is used for homogeneous products (continuous flow processes such as producing cans of soda).
Job-order costing is used in situations where the organization offers many different products or services, such as in furniture manufacturing, hospitals, and legal firms. Process costing is used where units of product are homogeneous, such as in flour milling or cement production. The purpose of a job order cost accounting system is to assign and accumulate costs for each job, i. e. , an order, a contract, a unit of production, or a batch.
Job order costing should be used if the production or service is being performed to meet customer specifications or requirements, if different components a remade for inventory, or projects are undertaken to construct real property. Job order costing allows more control, less estimation, and more direct and reliable allocation of costs… Differences between job-order and process costing. The differences between job-order and process costing occur because the flow of units in a process costing system is more or less continuous and the units are essentially indistinguishable from one another. Under process costing: a. A single homogeneous product is produced on a continuous basis over a long period of time.
The Essay on Job Order and Process Costing Systems – Quiz
... job-order costing or process costing. Student Answer: Job order costing is where a company produces different products each period, they are made to order, All costs ... Transferred out= 30,000+ work in process 8,000= 38,000 ii. The cost per equivalent unit for conversion.= $7.50 ( ... 243,000 cost per unit 243,000/ total weighted avg unit 32,400 = $7.50 per unit iii. The total cost assigned to units ...
This differs from job-order costing in which many different products may be produced in a single period. b. Total costs are accumulated by department, rather than by individual job. c. The department production report is the key document showing the accumulation and disposition of cost, rather than the job-cost sheet. B.
Overview of Process Costing. Manufacturing costs are accumulated in processing departments in a process costing system. A processing department is any location in the organization where work is performed on a product and where materials, labor, and overhead costs are added to the product. Processing departments should also have two other features. First, the activity performed in the processing department should be essentially the same for all units that pass through the department. Second, the output of the department should be homogeneous.
In process costing, the average cost of processing units for a period is assigned to each unit passing through the department. Two process costing methods are illustrated in the text-the weighted-average method and the FIFO method. While the FIFO method provides more current cost data for decision-making and performance evaluation purposes, it is more difficult to grasp. For that reason, the FIFO method is covered in an appendix..