G.H.Patel Post Graduate Institute of Business Management, Vallabh Vidhyanagar, Anand In the undivided Bombay province was worked out to build earthen dams and problems faced while building a dam across the rivers Lokmata and Sadmata in northern Gujarat and further issues encountered while a proposal is made to raise the control levels of it. The objective of the case is to maximize the irrigation potential of the dam while respecting the religious sentiments of the people. The options are either to implement the former plan in its present form or the latter by convincing the people of its benefits and deal with the issues faced. The conclusion is to try and implement the new plan resulting in maximization of irrigation and revenues. PROPOSAL 1 PROPOSAL 2 Approximate cost – 1.7 Approximate cost – 1.9 Water impound – 4700 Water impound –5700 Full supply level -592 Full supply level-595 Highest flood level-596 highest flood level-606 OBJECTIVES
* Government aim for economic development through agricultural development. * Build the dam
PROBLEM
* Opposition of people to temple getting submerged
* People getting affected due to submerge of villages
CONSTRAIN
* Location of dam
CRITERIA
* Maximum irrigation
* minimum people affected
* Maximum returns
* Minimum time
The Essay on Carbon Monoxide People Cspc Levels
The Invisible Killer Nearly three hundred people in the United States alone, die from the poisonous gas called carbon monoxide every year. Several thousand others go to hospital emergency rooms for treatment of this serious adverse dormant gas every year as well (CSPC 466). Carbon monoxide (CO) is a colorless, tasteless, odorless, latent gas produced by the incomplete burning of solid, liquid and ...
* Minimum cost
PRIORITY
* Minimum people affected
* Minimum cost
* Minimum time
* Minimum returns
* Maximum irrigation
ALTERNATIVES
* Convincing villages to shift temple
* Resettlement of affected people
* Raising height of the temple
ACTION PLAN
Government should follow proposal 1 as temple was saved using gates from flood so that minimum people are affected so the cost incurred is also low and the time required is minimum and also there is irrigation which leads to economic development. CONTINGENCY PLAN
* Raising height of the temple
* Go with proposal 2 if proposal 1 does not work