1 1. INTRODUCTION
2
The concept of project scope may be one of the most ample in project management. It involves objectives, limits and intentions. Every requirement in a project as well as its characteristics must be dealt with when planning the scope. Even though it’s reasonable to say that every project is unique, the causes for which it fails are generally the same. And if you already know what these causes are, you can minimize the likelihood of problems being repeated and thus increase the chance of success.
It has been said that you can often detect if a project is going to fail in its first two months. Projects are normally approved and initiated with unrealistic expectations and with an excess of optimism. These expectations can inflate beyond reasonability during the execution of a project, often resulting in what is called 都cope creep It’s important to manage expectations, particularly to those stakeholders that are not heavily involved in the project. This issue is going to be addressed in this assignment and some practical solutions will be proposed as a way to manage and control this problem. 2
3 2. DEFINITION
Scope Creep is a term used by project managers to describe the extra deliverables or additional requirements that were not planned in the project’s initial phase.
According to the HBR Guide to Project Management (2012) ‘scope creep’ is the tendency (often as a result of pressure from stakeholders) to permit changes that exceed a project’s scope and may wreak havoc on the schedule, the quality of the work, or the budget.
The Essay on Project Scope Management
... have been avoided? How? Can scope creep be a good thing? ... example of scope validation on a project. 6.Using examples in this book or online, describe a project that suffered from scope creep. Could it ... the plans to meet customer expectations. In addition to, using project metrics to monitor and identify creep. 7.Why do you need a ...
As it was often cited in class, no project can achieve success without proper coordination between three essentials: scope, schedule and cost. Change one, and the other two will be impacted. On the other hand, trying to prohibit all changes to a project is often fruitless and can have very adverse consequences.
According to the Project Management Institute (PMI, 2013), 壮cope creepis the incremental expansion of the project痴 scope e.g. through additional work requests – without the necessary readjustment of the other two elements: schedule and cost.
As most projects are required to meet deadlines with resource restrains, managing the scope creep through careful planning and control is an essential ability to every project manager. There are a number of causes for scope creep in projects, and these will be addressed in the next chapters as well as a few solutions to prevent further damage to the project.
3. CAUSES
Scope creep can be one of the worst enemies of a project manager, specially if it’s not adequately addressed. It includes anything that was not part of the initial scope and was added without passing through an evaluation process.
According to Shore (2014), a project that starts out to achieve one set of results may find that it has many more objectives added on to it before it is complete. Because a project’s scope is mapped out in advance, success on this dimension can be gauged at any point in time partly by whether the project is reaching its objectives.
A small increase in scope may not have a big impact, but if there’s an accumulation of these, the project may have its budget or schedule significantly increased. Assuming that you know what is needed, without proper investigation and analysis and underestimating the complexity of a project are common mistakes, but there are a number of other causes for scope creep. Some of these are:
Scope not clearly defined in the Project Plan;
Not giving sufficient time for requirements; lack of proper analysis; Lack of communication with significant stakeholders;
Change in business or technical landscape.
In addition to these, one cause that is often cited is gold plating which is the practice of exceeding the scope of a project in the belief it is adding value. It’s important to notice that this belief is not guaranteed and could lead to a significant increase in scope. The knowledge of this common occurrence may prove beneficial when there is a need to address this matter with a sponsor, a client or other stakeholders.
The Essay on Project Scope
Project scope is the parameter of the project. It defines what are the deliverables, requirements and expectations for the project and provides a baseline to exclude unrelated works. The project manager’s job is to ensure all necessary works for the project success are included. And this process is referring to as the project scope management. Project scope management involves six processes, which ...
Needless to say, when every item on a project is addressed in a specific, measurable and achievable way, most of these issues won’t arise. A few solutions to scope creep will be addressed in the next chapter. 4
5 4. SOLUTIONS
When addressing solutions for this particular problem, it’s reasonable to first understand what is expected of the project and collaborate to achieve maximum levels of communication with stakeholders. Taking a practical approach is always useful when dealing with clients and sponsors. A few of the solutions that address scope creep are:
Define and document the scope of the project in a clear and tangible manner;
Conduct scope specified meetings with stakeholders;
Regulate what is acceptable in change requirements with the team;
Associate a price tag to every new requirement;
Use control mechanisms as a change control board and change management forms;
Define project risks and mitigation plans that affect scope
Another solution is acquiring software that allows you to manage key elements of the project. Win(win) software has management tools that control scope creep. It tracks budget and has milestones watch lists set for the projects to give clear indication if suppliers are on track and if the project will be delivered on time. It gives alerts and allows you to easily share the content with stakeholders. This could help giving support and control over issues in a manageable way.
5. CONCLUSION
Managing scope creep wisely will always be fundamental to every project’s approach towards achieving its goals. It may be one of the most challenging aspects, but the most important factor to prevent it, is to understand where things go awry and get out ahead of the issue. Taking a proactive approach should make the project run more smoothly.
The Business plan on Project Cycle Management
Chapter 3 introduces the Logical Framework Approach (LFA), explaining its role in project design with a simple project example. It explains how sustainability / quality factors can influence a project’s chances for success, and indicates the range of Where to tools that are available to take account of these factors. It also explains how you can find what? use the logframe matrix to develop ...
6. REFERENCES
HBR (2012).
Guide to Project Management. Boston: Harvard Business Review Press.
Shore, David A. (2014).
Launching and Leading Change Initiatives in HealthCare Organizations. Boston: Jossey-Bass.
PMI. 2013. Project Management Institute. (ONLINE) Available at: http://www.pmi.org/Learning/requirements-management/resource-library/scope-management.aspx. (Accessed 13 January 15).
University Alliance (2014) Managing Scope Creep in Project Management. (ONLINE) Available at: http://www.villanovau.com/resources/project-management/project-management-scope-creep/#.VLcId2TF8rM. (Accessed 13 January 15)
PM Docs. 2011. How to Manage Scope Creep. (ONLINE) Available at: http://www.projectmanagementdocs.com/blog/how-to-manage-scope-creep.html. (Accessed 13 January 15).
Bob McGannon. 2013. Insights from a Project Manager. (ONLINE) Available at: http://www.lynda.com/Business-Business-Skills-tutorials/preventing-scope-creep/137907/149278-4.html. (Accessed 13 January 15).
YFS Magazine. 2012. How to Avoid Project Management 全cope CreepAt All Costs. (ONLINE) Available at: http://yfsmagazine.com/2013/10/17/project-management-scope-creep/. (Accessed 13 January 15).
Richard Bellanca. 2008. Beat the Omnipresent Scope Creep With Communications. (ONLINE) Available at: http://www.isixsigma.com/implementation/project-selection-tracking/beat-omnipresent-scope-creep-communications/. (Accessed 13 January 15).
Daily Record. 2012. Combating scope creep for Project Managers. (ONLINE) Available at: http://www.dailyrecord.co.uk/special-features/combating-scope-creep-project-managers-3670327. (Accessed 12 January 15).
Win(win) Software (2015) Large Hotel Chain Manages Scope Creep Using WIN(win).
(ONLINE) Available at: http://www.winwinit.com/case-studies/large-hotel-chain-manages-scope-creep-using-winwin. (Accessed 13 January 15).
Kareem Shaker. 2010. Scope Creep and Gold Plating are two sides of the same coin. (ONLINE) Available at: http://kareemshaker.com/project-management/scope-creep-and-gold-plating-are-two-sides-of-the-same-coin/. (Accessed 12 January 15).
The Term Paper on Project Management For Information Systems
Abstract Information systems (IS) projects are vulnerable to resource cutbacks and the increasing complexity of systems and advances in information technology make finding the right personnel difficult and the associated development costs high. Good project management is essential for success. Some alignment methodologies include IBM's business systems planning (BSP), Robert Holland's strategic ...