The project has a strong back up from the government and the private sector that is the MMC Berhad-GAMUDA Berhad to complete the project without any financial issue. The SMART tunnel project is jointly funded by the government, which is the project owner, and the project promoter, MMC-Gamuda Joint Venture, who will finance the road tunnel section at a cost to be recovered by toll collection concession from the government in 40 years time. Delay in the Schedule:
The SMART tunnel construction is being monitored Daily, weekly and monthly site progress planning are conducted to overcome any possibility in the delay of the works. As an example, usually the Construction of a bored tunnel along this length will be using NATM techniques. However, it would have been slow and costly and would in practice require systematic advance jet grouting from the surface. In order to ensure the SMART tunnel construction time is finish according to the timeline given and within the safety measure of the tunnel boring, therefore this length is reverted to tunnel boring machine (TBM) excavation.
Environmental Issue:
Besides the using of TBM machines to enable the project done during the given timeline, it also being used for all bored tunnel excavation as it carried less risk of environmental disturbance as the tunnel was build in n urbanized area. The main contractor elected to use 2 TBMs for the tunneling as when tunneling is done under urban infrastructure, ground disturbance such as incidents of sink-holes and ground settlements can be minimized, in perspective of the risks involved.
The Term Paper on Analytical Study Of Ecops: E-Governance Project By Government Of Andhra Pradesh
The police force in Andhra Pradesh (AP) state, India, introduced a network-based system (eCOPS) in 2002 to help, among other things, improve the openness with which criminal cases are handled. Introduction The concept of e-governance has made its way with Andhra Pradesh leading the country in the field of technological advances. With the launch of eCOPS in June 2002 and later its state-wide ...
Public Safety Issue:
The tunnel runs at shallow depth below an urbanized area so that objections to blasting would be expected. Vibration limits were set at 12mm/s at buildings and 25mm/s elsewhere, hours of blasting were to be restricted to within 150m of buildings. The project area and the method of the tunneling work will not harm in any form to the public Traffic Control:
During the construction time of the SMART tunnel, the project has some traffic control issue in the certain areas, but with adequate detours and signage, traffic control by the police traffic during the construction hour helps to overcome the issue The risk if SMART Tunnel Project not initiated
Last but not least, referring to the construction of the SMART tunnel can be seen that there is more negative risks if the SMART tunnel is not initiated as there will be frequent flooding in the city of Kuala Lumpur that will consequently causes lots of damage to the peoples’ property and might be also causing loss of lives if there is a major flood happens. Nevertheless, without initiating this project, the major traffic congestion in the city would never been reduced and might become more crucial in the next decades.